Avaya Lab
Avaya Lab is a renovation/alteration project at 6031 Connection Drive Suites 170-175, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $1.2M across about 3,431 sq ft.
๐Project Metrics
TDLR #TABS2020005049Project Closed
Project has been completed and closed
Avaya Lab is a Renovation/Alteration project located at 6031 Connection Drive Suites 170-175, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $1.2M covering 3,431 sq ft. Piedmont Office Realty Trust is the property owner and Benson Hlavaty Architects is the design firm of record. The project was registered with TDLR on November 11, 2019.
โFrequently Asked Questions
What is Avaya Lab?
Avaya Lab is a renovation/alteration project at 6031 Connection Drive Suites 170-175 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish-out
Is Avaya Lab open in Irving?
Construction on Avaya Lab is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is Avaya Lab located?
Avaya Lab is located at 6031 Connection Drive Suites 170-175, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of Avaya Lab?
Piedmont Office Realty Trust is the property owner/developer of record for Avaya Lab, per its TDLR project registration.
Who is the architect or design firm for Avaya Lab?
Benson Hlavaty Architects is the design firm of record for Avaya Lab, according to its TDLR filing.
How much does Avaya Lab cost and how big is it?
Avaya Lab has an estimated construction value of $1.2M and approximately 3,431 square feet (about $350/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 11, 2019
Review Complete
Inspection Complete
Closed
Dec 12, 2019