The Toasted Yolk Cafe
The Toasted Yolk Cafe is a renovation/alteration project at 27008 Northwest Freeway, Suite #100, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2020). The project has an estimated value of $700K across about 4,985 sq ft.
๐Project Metrics
TDLR #TABS2020006352Project Closed
Project has been completed and closed
The Toasted Yolk Cafe is a Renovation/Alteration project located at 27008 Northwest Freeway, Suite #100, Cypress, TX 77433 in Cypress, Texas. The project has an estimated value of $700K covering 4,985 sq ft. Cyril Thomas is the property owner and idstudio4 is the design firm of record. The project was registered with TDLR on November 26, 2019.
โFrequently Asked Questions
What is The Toasted Yolk Cafe?
The Toasted Yolk Cafe is a renovation/alteration project at 27008 Northwest Freeway, Suite #100 in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish Out of a first gen. space located in a shopping center
Is The Toasted Yolk Cafe open in Cypress?
Construction on The Toasted Yolk Cafe is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2020. The building is finished and very likely open.
Where is The Toasted Yolk Cafe located?
The Toasted Yolk Cafe is located at 27008 Northwest Freeway, Suite #100, Cypress, TX, 77433, in Harris County.
Who is the owner or developer of The Toasted Yolk Cafe?
Cyril Thomas is the property owner/developer of record for The Toasted Yolk Cafe, per its TDLR project registration.
Who is the architect or design firm for The Toasted Yolk Cafe?
idstudio4 is the design firm of record for The Toasted Yolk Cafe, according to its TDLR filing.
How much does The Toasted Yolk Cafe cost and how big is it?
The Toasted Yolk Cafe has an estimated construction value of $700K and approximately 4,985 square feet (about $140/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Finish Out of a first gen. space located in a shopping center
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 26, 2019
Review Complete
Inspection Complete
Closed
Mar 31, 2020