CHICK-FIL-A is a renovation/alteration project at 3700 NORTH TERMINAL RD SPACE FC202.13, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $909K across about 1,526 sq ft.
Project has been completed and closed
CHICK-FIL-A is a Renovation/Alteration project located at 3700 NORTH TERMINAL RD SPACE FC202.13, Houston, TX 77032 in Houston, Texas. The project has an estimated value of $909K covering 1,526 sq ft. Houston Airport Systems is the property owner and idstudio4 is the design firm of record. The project was registered with TDLR on August 27, 2024.
CHICK-FIL-A is a renovation/alteration project at 3700 NORTH TERMINAL RD SPACE FC202.13 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish Out of an existing lease. Improved shall include complete interior finish, including new non-load-bearing walls, ceilings, floor finishes, millwork, seating, and MEP work.
Construction on CHICK-FIL-A is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
CHICK-FIL-A is located at 3700 NORTH TERMINAL RD SPACE FC202.13, Houston, TX, 77032, in Harris County.
Houston Airport Systems is the property owner/developer of record for CHICK-FIL-A, per its TDLR project registration.
idstudio4 is the design firm of record for CHICK-FIL-A, according to its TDLR filing.
CHICK-FIL-A has an estimated construction value of $909K and approximately 1,526 square feet (about $596/sqft), based on its TDLR filing.
Tenant Finish Out of an existing lease. Improved shall include complete interior finish, including new non-load-bearing walls, ceilings, floor finishes, millwork, seating, and MEP work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 27, 2024
Review Complete
Inspection Complete
Jan 31, 2025
Closed
Jan 16, 2026