McBee Elementary School HVAC & Plumbing Renovations
๐Project Metrics
TDLR #TABS2020007084Project Closed
Project has been completed and closed
๐Scope of Work
Replace of existing HVAC unit and repair of plumbing fixtures and floor drains. Replace ceramic tile in 2 restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
REPLACE OFCI COOLING TOWER AND ASSOCIATED CONDENSER WATER PIPING TWO (2) OFCI ROOFTOP PACKAGE UNITS (RTU-6 AND RTU-7) AT LIBRARY GAS PIPE AT ROOF ELECTRICAL WATER HEATERS VALVES AND EXPANSION TANKS. CONVERT CLASSROOMS TO MENTAL HEALTH SUITE AND PROFESSIONAL LEARNING
REPLACE OFCI COOLING TOWER AND ASSOCIATED CONDENSER WATER PIPING TWO (2) OFCI ROOFTOP PACKAGE UNITS (RTU-6 AND RTU-7) AT LIBRARY GAS PIPE AT ROOF ELECTRICAL WATER HEATERS VALVES AND EXPANSION TANKS. CONVERT CLASSROOMS TO MENTAL HEALTH SUITE AND PROFESSIONAL LEARNING
REPLACE OFCI COOLING TOWER AND ASSOCIATED CONDENSER WATER PIPING TWO (2) OFCI ROOFTOP PACKAGE UNITS (RTU-6 AND RTU-7) AT LIBRARY GAS PIPE AT ROOF ELECTRICAL WATER HEATERS VALVES AND EXPANSION TANKS. CONVERT CLASSROOMS TO MENTAL HEALTH SUITE AND PROFESSIONAL LEARNING
REPLACE ROOF AREAS A01 A03 A08 A10 A16 A17 AND A18. AISD PROJECT
REPLACE OFCI COOLING TOWER AND ASSOCIATED CONDENSER WATER PIPING TWO (2) OFCI ROOFTOP PACKAGE UNITS (RTU-6 AND RTU-7) AT LIBRARY GAS PIPE AT ROOF ELECTRICAL WATER HEATERS VALVES AND EXPANSION TANKS. CONVERT CLASSROOMS TO MENTAL HEALTH SUITE AND PROFESSIONAL LEARNING