Traffic Signal at Bagdad Rd & Sonny Dr
๐Project Metrics
TDLR #TABS2020007451Review Complete
Design review complete, construction may proceed
๐Scope of Work
Installation of a traffic signal at the intersection of Sonny Drive & Bagdad Road. Reconstruction of 100' of Sonny Drive to eliminate excessive slope on east side of intersection. Utility relocations as necessary to accommodate the traffic signal.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$27.1M total๐๏ธSame Design Firm
$18.4M total๐Related City Permits
Building permits found at or near this location
installaiton of solar panels
Repair of main service panel
Replacement of complete existing central heat and air system with or without duct work
Partial demo. Interior remodel. Remove interior wall separating the kitchen and dining as well as transforming a half bath and closet into a full master bath with walkin shower. Trades replaced. water heater replaced.
replace siding windows drywall and sheetrock repairs as needed. replace exterior doors. replace roof. adding PP permit replace sewer lines and water lines. adding EP. re wire home. adding MP: New ducts and system