Project has been completed and closed
Kaufman Street Reconstruction Phase 1 is a Renovation/Alteration project located at Kaufman Street, Waxahachie, TX 75168 in Waxahachie, Texas. The project has an estimated value of $59K covering 1 sq ft. City of Waxahachie is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on March 12, 2020.
Kaufman Street Reconstruction Phase 1 is a renovation/alteration project at Kaufman Street, Waxahachie, TX 75168 in Waxahachie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New sidewalks and curb ramps along both sides of the reconstruction corridor.
Construction on Kaufman Street Reconstruction Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2021. The building is finished and very likely open.
Kaufman Street Reconstruction Phase 1 is located at Kaufman Street, Waxahachie, TX 75168, Waxahachie, TX, 75168, in Ellis County.
City of Waxahachie is the property owner/developer of record for Kaufman Street Reconstruction Phase 1, per its TDLR project registration.
Kimley-Horn and Associates, Inc. is the design firm of record for Kaufman Street Reconstruction Phase 1, according to its TDLR filing.
Kaufman Street Reconstruction Phase 1 has an estimated construction value of $59K and approximately 1 square feet (about $58.65K/sqft), based on its TDLR filing.
New sidewalks and curb ramps along both sides of the reconstruction corridor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 12, 2020
Review Complete
Inspection Complete
Closed
Jan 30, 2021