Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Thorpe Lane Sidewalk Rehabilitation
Thorpe Lane from E Hopkins St. to Aquarena Springs, San Marcos, TX, 78666
Thorpe Lane Sidewalk Rehabilitation is a renovation/alteration project at Thorpe Lane from E Hopkins St. to Aquarena Springs, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $662K across about 7,381 sq ft.
- Estimated project value
- $662K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 7,381 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $90/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
42 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
18 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78666 (San Marcos)
One email per change. Unsubscribe in one click. Privacy.
Thorpe Lane Sidewalk Rehabilitation is a Renovation/Alteration project located at Thorpe Lane from E Hopkins St. to Aquarena Springs, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $662K covering 7,381 sq ft. City of San Marcos - Capital Improvements/Engineering is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on June 4, 2026.
Frequently Asked Questions
What is Thorpe Lane Sidewalk Rehabilitation?
Thorpe Lane Sidewalk Rehabilitation is a renovation/alteration project at Thorpe Lane from E Hopkins St. to Aquarena Springs in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of existing sidewalk and driveways (7,381 SF)
Is Thorpe Lane Sidewalk Rehabilitation open in San Marcos?
Thorpe Lane Sidewalk Rehabilitation was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Thorpe Lane Sidewalk Rehabilitation located?
Thorpe Lane Sidewalk Rehabilitation is located at Thorpe Lane from E Hopkins St. to Aquarena Springs, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of Thorpe Lane Sidewalk Rehabilitation?
City of San Marcos - Capital Improvements/Engineering is the property owner/developer of record for Thorpe Lane Sidewalk Rehabilitation, per its TDLR project registration.
Who is the architect or design firm for Thorpe Lane Sidewalk Rehabilitation?
Kimley-Horn and Associates, Inc. is the design firm of record for Thorpe Lane Sidewalk Rehabilitation, according to its TDLR filing.
How much does Thorpe Lane Sidewalk Rehabilitation cost and how big is it?
Thorpe Lane Sidewalk Rehabilitation has an estimated construction value of $662K and approximately 7,381 square feet (about $90/sqft), based on its TDLR filing.
Scope of Work
Reconstruction of existing sidewalk and driveways (7,381 SF)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Thorpe Lane from E Hopkins St. to Aquarena Springs, San Marcos, TX, 78666
Watch all construction in 78666 (San Marcos)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Marcos?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.