Hubbell is a new construction project at 710 Hesters Crossing Rd. Suite 100 & 190, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2020). The project has an estimated value of $726K across about 14,790 sq ft.
Project has been completed and closed
Hubbell is a New Construction project located at 710 Hesters Crossing Rd. Suite 100 & 190, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $726K covering 14,790 sq ft. Mark IV Capital is the property owner. The project was registered with TDLR on April 1, 2020.
Hubbell is a new construction project at 710 Hesters Crossing Rd. Suite 100 & 190 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of Suite 100 and 190.
Construction on Hubbell is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2020. The building is finished and very likely open.
Hubbell is located at 710 Hesters Crossing Rd. Suite 100 & 190, Round Rock, TX, 78681, in Williamson County.
Mark IV Capital is the property owner/developer of record for Hubbell, per its TDLR project registration.
Hubbell has an estimated construction value of $726K and approximately 14,790 square feet (about $49/sqft), based on its TDLR filing.
New construction of Suite 100 and 190.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 1, 2020
Review Complete
Inspection Complete
Closed
Jun 22, 2020
Building permits found at or near this location
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
Express: Tub-shower conversion replace 416 sqft of siding replace GFCIs outlets in kitchen and bathroom add drain pump from kitchen sink and run 60 ln ft of 2 pvc from pump to main drain line
New 2-story single family residence 4 bed/3.5 bath attached garage covered porch and covered patio Green Building
Replace skylight translucent panels.
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson