Apron Breakroom
Apron Breakroom is a renovation/alteration project at 3600 Presidential Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2020). The project has an estimated value of $194K across about 940 sq ft.
๐Project Metrics
TDLR #TABS2020015809Inspection Complete
Final inspection completed, awaiting project closure
Apron Breakroom is a Renovation/Alteration project located at 3600 Presidential Blvd, Austin, TX 78719 in Austin, Texas. The project has an estimated value of $194K covering 940 sq ft. Austin-Bergstrom International Airport is the property owner and PGAL is the design firm of record. The project was registered with TDLR on April 17, 2020.
โFrequently Asked Questions
What is Apron Breakroom?
Apron Breakroom is a renovation/alteration project at 3600 Presidential Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell space finish out
Is Apron Breakroom open in Austin?
Construction on Apron Breakroom is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2020. The building is finished and very likely open.
Where is Apron Breakroom located?
Apron Breakroom is located at 3600 Presidential Blvd, Austin, TX, 78719, in Travis County.
Who is the owner or developer of Apron Breakroom?
Austin-Bergstrom International Airport is the property owner/developer of record for Apron Breakroom, per its TDLR project registration.
Who is the architect or design firm for Apron Breakroom?
PGAL is the design firm of record for Apron Breakroom, according to its TDLR filing.
How much does Apron Breakroom cost and how big is it?
Apron Breakroom has an estimated construction value of $194K and approximately 940 square feet (about $206/sqft), based on its TDLR filing.
๐Scope of Work
Shell space finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 17, 2020
Review Complete
Inspection Complete
Jul 20, 2020
Closed
๐Related Projects
๐คSame Owner
$19.2M total๐Related City Permits
Building permits found at or near this location
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
EM repair of 2.5 C for 225A panel feeders that faulted. Pulled new conductors and cut in pull points.
Replacement of an existing water heater replace ng water heater
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Per Tx Gas while they repair a gas leak on their main we need to relocate the gas meter away from windows electrical tankless crawl space vents.