KENDRA SCOTT
KENDRA SCOTT is a renovation/alteration project at 3600 PRESIDENTIAL BLVD STE #3703, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $850K across about 404 sq ft.
๐Project Metrics
TDLR #TABS2025025013Project Closed
Project has been completed and closed
KENDRA SCOTT is a Renovation/Alteration project located at 3600 PRESIDENTIAL BLVD STE #3703, Austin, TX 78719 in Austin, Texas. The project has an estimated value of $850K covering 404 sq ft. Austin-Bergstrom International Airport is the property owner. The project was registered with TDLR on August 4, 2025.
โFrequently Asked Questions
What is KENDRA SCOTT?
KENDRA SCOTT is a renovation/alteration project at 3600 PRESIDENTIAL BLVD STE #3703 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR TENANT ALTERATION OF EXISTING SPACE
Is KENDRA SCOTT open in Austin?
Construction on KENDRA SCOTT is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is KENDRA SCOTT located?
KENDRA SCOTT is located at 3600 PRESIDENTIAL BLVD STE #3703, Austin, TX, 78719, in Travis County.
Who is the owner or developer of KENDRA SCOTT?
Austin-Bergstrom International Airport is the property owner/developer of record for KENDRA SCOTT, per its TDLR project registration.
How much does KENDRA SCOTT cost and how big is it?
KENDRA SCOTT has an estimated construction value of $850K and approximately 404 square feet (about $2.10K/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR TENANT ALTERATION OF EXISTING SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 4, 2025
Review Complete
Aug 4, 2025
Inspection Complete
Jan 25, 2026
Closed
Apr 23, 2026
174d
Construction phase
๐Related Projects
๐คSame Owner
$19.2M total๐Related City Permits
Building permits found at or near this location
Replace landings and cat walk replace guardrails replace siding and trim install new piers and columns extend roof over stairs.
Rebuild/replace uncovered wood decks attached to rear/side of existing 2-story single family residence.
Replacement of complete existing central heat and air system with or without duct work Replace existing 3-ton heat-pump HVAC system like-for-like; no structural change.
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
EM repair of 2.5 C for 225A panel feeders that faulted. Pulled new conductors and cut in pull points.