South Austin 7th Floor Renovation
๐Project Metrics
TDLR #TABS2020017245Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
The South Austin Medical Center's 7th floor shell is to be built out with 34 Medical/Surgical patient rooms (single beds) with additional support spaces for patients and staff.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$18.2M total๐Related City Permits
Building permits found at or near this location
Remodel Hospital -Boiler Replacement
ePlan Review: New O2 Park SP-2024-0413C - In Review
Disconnect/Reconnect 758018 - Switch Gear Maintenance serves entire bldg
*Austin Energy shuts down only we are going to perform preventative maintenance by cleaning tightening and torquing main switchgear internal components then Austin Energy re-energizes. 788018 - Switchgear maintenance/cleaning switchgear
installation of 50k WAC Ballasted roof top auxiliary power system
๐Related Site Plans
City of Austin site plan approvals at this location