Project has been completed and closed
SAMC RF Room Renovation is a Renovation/Alteration project located at 901 W. Ben White Blvd, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $150K covering 600 sq ft. St. David's South Austin Medical Center is the property owner and BSA LifeStructures is the design firm of record. The project was registered with TDLR on November 30, 2020.
SAMC RF Room Renovation is a renovation/alteration project at 901 W. Ben White Blvd, Austin, TX 78704 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of spaces within existing Radiology Suite on Level 1 of St. David's South Austin Medical Center to accommodate a new R/F (Radiography/ Fluoroscopy) machine.
Construction on SAMC RF Room Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2021. The building is finished and very likely open.
SAMC RF Room Renovation is located at 901 W. Ben White Blvd, Austin, TX 78704, Austin, TX, 78704, in Travis County.
St. David's South Austin Medical Center is the property owner/developer of record for SAMC RF Room Renovation, per its TDLR project registration.
BSA LifeStructures is the design firm of record for SAMC RF Room Renovation, according to its TDLR filing.
SAMC RF Room Renovation has an estimated construction value of $150K and approximately 600 square feet (about $250/sqft), based on its TDLR filing.
Renovation of spaces within existing Radiology Suite on Level 1 of St. David's South Austin Medical Center to accommodate a new R/F (Radiography/ Fluoroscopy) machine.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 30, 2020
Review Complete
Inspection Complete
Closed
Mar 22, 2021
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.