Pickel Renovation
๐Project Metrics
TDLR #TABS2026003677Review Complete
Design review complete, construction may proceed
๐Scope of Work
Interior renovation of existing lab, research, and support spaces on the first floor of the Engineering Teaching Center II (ETC) Building to provide the infrastructure required for three optics rooms and a wet lab.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.2M total๐๏ธSame Design Firm
$2.4M total๐Related City Permits
Building permits found at or near this location
Convert existing 100 amp service from overhead to underground for a Spectrum CATV cabinet.
REPLACING CURRENT TANK-STYLE WATER HEATER FOR A TANKLESS GAS WATER HEATER
Replacement of complete existing central heat and air system with or without duct work
*Partial Demo* Addition and interior remodel of an existing single-story residence including a new attached garage with second-floor accessory space new porch uncovered deck driveway and retroactive permitting of the rear first-floor addition.
Excavate 10 tunnel to repair main drain line under house