TMC - HP - Level 3 PICU Renovation is a renovation/alteration project at 6411 Fannin St., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $5.1M across about 29,180 sq ft.
Project has been completed and closed
TMC - HP - Level 3 PICU Renovation is a Renovation/Alteration project located at 6411 Fannin St., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $5.1M covering 29,180 sq ft. Memorial Hermann is the property owner and HKS Inc. is the design firm of record. The project was registered with TDLR on January 4, 2021.
TMC - HP - Level 3 PICU Renovation is a renovation/alteration project at 6411 Fannin St. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope of work includes the renovation of the existing STICU to a pediatric ICU.
Construction on TMC - HP - Level 3 PICU Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
TMC - HP - Level 3 PICU Renovation is located at 6411 Fannin St., Houston, TX, 77030, in Harris County.
Memorial Hermann is the property owner/developer of record for TMC - HP - Level 3 PICU Renovation, per its TDLR project registration.
HKS Inc. is the design firm of record for TMC - HP - Level 3 PICU Renovation, according to its TDLR filing.
TMC - HP - Level 3 PICU Renovation has an estimated construction value of $5.1M and approximately 29,180 square feet (about $175/sqft), based on its TDLR filing.
Scope of work includes the renovation of the existing STICU to a pediatric ICU.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 4, 2021
Review Complete
Inspection Complete
Closed
Dec 31, 2021