Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis
Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis is a new construction project at Whittier to Davis, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $832K across about 35,520 sq ft.
๐Project Metrics
TDLR #TABS2021007030Project Closed
Project has been completed and closed
Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis is a New Construction project located at Whittier to Davis, El Paso, TX 79907 in El Paso, Texas. The project has an estimated value of $832K covering 35,520 sq ft. Ismael Cepeda is the property owner and Meridian Green Works, LLC is the design firm of record. The project was registered with TDLR on January 6, 2021.
โFrequently Asked Questions
What is Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis?
Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis is a new construction project at Whittier to Davis in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The removal and disposal of existing concrete sidewalks, driveways, handicap ramps, curbs and curb and gutter etc. In preparation for construction of a new walking trail and included amenities.
Is Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis open in El Paso?
Construction on Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis located?
Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis is located at Whittier to Davis, El Paso, TX, 79907, in El Paso County.
Who is the owner or developer of Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis?
Ismael Cepeda is the property owner/developer of record for Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis, per its TDLR project registration.
Who is the architect or design firm for Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis?
Meridian Green Works, LLC is the design firm of record for Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis, according to its TDLR filing.
How much does Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis cost and how big is it?
Playa Drain Trail Phase 2 Segment 1: from Whittier to Davis has an estimated construction value of $832K and approximately 35,520 square feet (about $23/sqft), based on its TDLR filing.
๐Scope of Work
The removal and disposal of existing concrete sidewalks, driveways, handicap ramps, curbs and curb and gutter etc. In preparation for construction of a new walking trail and included amenities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 6, 2021
Review Complete
Inspection Complete
Closed
Aug 17, 2022
๐Related Projects
๐๏ธSame Design Firm
$1.9M totalProperty Owner
Design Firm
Registered Accessibility Specialist
El Paso County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in El Paso County
Find General Contractors in El Paso