Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive is a new construction project at Knights Drive to Yarborough Drive, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.1M across about 45,930 sq ft.
๐Project Metrics
TDLR #TABS2021007037Review Complete
Design review complete, construction may proceed
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive is a New Construction project located at Knights Drive to Yarborough Drive, El Paso, TX 79907 in El Paso, Texas. The project has an estimated value of $1.1M covering 45,930 sq ft. Alondra Gurrola is the property owner and Meridian Green Works, LLC is the design firm of record. The project was registered with TDLR on January 6, 2021.
โFrequently Asked Questions
What is Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive?
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive is a new construction project at Knights Drive to Yarborough Drive in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The removal of existing concrete sidewalk, driveways, handicap ramps, curb and curb and gutter, in preparation for the construction of a new walking trail and included amenities.
Is Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive open in El Paso?
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive is currently under construction in El Paso, TX. Its current TDLR status is "Review Complete".
Where is Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive located?
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive is located at Knights Drive to Yarborough Drive, El Paso, TX, 79907, in El Paso County.
Who is the owner or developer of Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive?
Alondra Gurrola is the property owner/developer of record for Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive, per its TDLR project registration.
Who is the architect or design firm for Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive?
Meridian Green Works, LLC is the design firm of record for Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive, according to its TDLR filing.
How much does Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive cost and how big is it?
Playa Drain Trail Phase 2 Segment 2: Knights Drive to Yarborough Drive has an estimated construction value of $1.1M and approximately 45,930 square feet (about $24/sqft), based on its TDLR filing.
๐Scope of Work
The removal of existing concrete sidewalk, driveways, handicap ramps, curb and curb and gutter, in preparation for the construction of a new walking trail and included amenities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 6, 2021
Review Complete
Jan 6, 2021
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$1.9M totalProperty Owner
Design Firm
El Paso County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in El Paso County
Find General Contractors in El Paso