Catapult
Catapult is a renovation/alteration project at 5294 Beltline Suite 200, Addison, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2021). The project has an estimated value of $2.3M across about 27,448 sq ft.
๐Project Metrics
TDLR #TABS2021007742Project Closed
Project has been completed and closed
Catapult is a Renovation/Alteration project located at 5294 Beltline Suite 200, Addison, TX 75254 in Addison, Texas. The project has an estimated value of $2.3M covering 27,448 sq ft. PWP PROPERTY OWNER LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 19, 2021.
โFrequently Asked Questions
What is Catapult?
Catapult is a renovation/alteration project at 5294 Beltline Suite 200 in Addison, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant improvement
Is Catapult open in Addison?
Construction on Catapult is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2021. The building is finished and very likely open.
Where is Catapult located?
Catapult is located at 5294 Beltline Suite 200, Addison, TX, 75254, in Dallas County.
Who is the owner or developer of Catapult?
PWP PROPERTY OWNER LP is the property owner/developer of record for Catapult, per its TDLR project registration.
Who is the architect or design firm for Catapult?
Entos Design is the design firm of record for Catapult, according to its TDLR filing.
How much does Catapult cost and how big is it?
Catapult has an estimated construction value of $2.3M and approximately 27,448 square feet (about $84/sqft), based on its TDLR filing.
๐Scope of Work
tenant improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 19, 2021
Review Complete
Inspection Complete
Closed
Apr 30, 2021