Kitchen Finish Out is a renovation/alteration project at 3111 McCann Road, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2021). The project has an estimated value of $200K across about 1,500 sq ft.
Project has been completed and closed
Kitchen Finish Out is a Renovation/Alteration project located at 3111 McCann Road, Longview, TX 75605 in Longview, Texas. The project has an estimated value of $200K covering 1,500 sq ft. Hospitality Health ER, LLC is the property owner and Thacker | Davis Architects, Incorporated is the design firm of record. The project was registered with TDLR on March 22, 2021.
Kitchen Finish Out is a renovation/alteration project at 3111 McCann Road in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project is to finish out the 2nd floor space designated to be a kitchen for use by the facility, including equipment, finishes, and associated utilities.
Construction on Kitchen Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2021. The building is finished and very likely open.
Kitchen Finish Out is located at 3111 McCann Road, Longview, TX, 75605, in Gregg County.
Hospitality Health ER, LLC is the property owner/developer of record for Kitchen Finish Out, per its TDLR project registration.
Thacker | Davis Architects, Incorporated is the design firm of record for Kitchen Finish Out, according to its TDLR filing.
Kitchen Finish Out has an estimated construction value of $200K and approximately 1,500 square feet (about $133/sqft), based on its TDLR filing.
Project is to finish out the 2nd floor space designated to be a kitchen for use by the facility, including equipment, finishes, and associated utilities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 22, 2021
Review Complete
Inspection Complete
Closed
Apr 30, 2021