Renovations Into Clinics is a renovation/alteration project at 3133 Good Shepherd Way, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2022). The project has an estimated value of $6.5M across about 37,290 sq ft.
Project has been completed and closed
Renovations Into Clinics is a Renovation/Alteration project located at 3133 Good Shepherd Way, Longview, TX 75605 in Longview, Texas. The project has an estimated value of $6.5M covering 37,290 sq ft. CHRISTUS Trinity Mother Frances Health System is the property owner and Harris Craig Architects, Inc. is the design firm of record. The project was registered with TDLR on April 16, 2021.
Renovations Into Clinics is a renovation/alteration project at 3133 Good Shepherd Way in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of interior renovation of approximately 32,790 SF of the 1st floor and approximately 4,500 SF of the second floor.
Construction on Renovations Into Clinics is complete โ TDLR records show the project passed its required accessibility inspection in May 2022. The building is finished and very likely open.
Renovations Into Clinics is located at 3133 Good Shepherd Way, Longview, TX, 75605, in Gregg County.
CHRISTUS Trinity Mother Frances Health System is the property owner/developer of record for Renovations Into Clinics, per its TDLR project registration.
Harris Craig Architects, Inc. is the design firm of record for Renovations Into Clinics, according to its TDLR filing.
Renovations Into Clinics has an estimated construction value of $6.5M and approximately 37,290 square feet (about $174/sqft), based on its TDLR filing.
Project consists of interior renovation of approximately 32,790 SF of the 1st floor and approximately 4,500 SF of the second floor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 16, 2021
Review Complete
Inspection Complete
Closed
May 2, 2022