๐Scope of Work
Approximately 32,000 SF of interior renovations and 32,000 SF of new construction. The work, includes: Classroom Wing Addition, Performing & Fine Arts Addition, Kitchen Addition, Cafeteria Renovations, and Administration Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$85.2M total๐Related City Permits
Building permits found at or near this location
ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during construction.
Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2 locations 88 square feet; Interior 2 locations 18 square feet.
Interior Renovation of existing public restrooms within Austin-Bergstrom International Airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. No change of use area or building footprint.
Upgrade AT&T antenna and radio equipment on an existing cell phone facility on a rooftop.
REPLACE DAMAGED SERVICE DISCONNECT