Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations
📊Project Metrics
TDLR #TABS2021015513Project Closed
Project has been completed and closed
📋Scope of Work
Installation of a pedestrian hybrid beacon along with associated improvements, including; ramps, sidewalk, poles and foundations, conduit, crosswalk striping and signage, pedestrian and traffic signal heads and pushbuttons in existing ROW.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
👤Same Owner
$46.1M total📄Related City Permits
Building permits found at or near this location
Irrigation install
Express: Foundation repair
Secondary permit for walk in cooler installation only. Reference 2025-000611 MP
install new gas line for dryer connection inside home on 2nd floor laundry room
Replacement of complete existing central heat and air system with or without duct work