Austin Waterjet
Austin Waterjet is a new construction project at 8510 Lava Hill Road, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $900K across about 14,900 sq ft.
๐Project Metrics
TDLR #TABS2021016122Review Complete
Design review complete, construction may proceed
Austin Waterjet is a New Construction project located at 8510 Lava Hill Road, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $900K covering 14,900 sq ft. Jim Miller is the property owner and Oser Design, LLC is the design firm of record. The project was registered with TDLR on May 20, 2021.
โFrequently Asked Questions
What is Austin Waterjet?
Austin Waterjet is a new construction project at 8510 Lava Hill Road in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement Facility of a 14,900 sf facility
Is Austin Waterjet open in Austin?
Austin Waterjet is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Austin Waterjet located?
Austin Waterjet is located at 8510 Lava Hill Road, Austin, TX, 78744, in Travis County.
Who is the owner or developer of Austin Waterjet?
Jim Miller is the property owner/developer of record for Austin Waterjet, per its TDLR project registration.
Who is the architect or design firm for Austin Waterjet?
Oser Design, LLC is the design firm of record for Austin Waterjet, according to its TDLR filing.
How much does Austin Waterjet cost and how big is it?
Austin Waterjet has an estimated construction value of $900K and approximately 14,900 square feet (about $60/sqft), based on its TDLR filing.
๐Scope of Work
Replacement Facility of a 14,900 sf facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 20, 2021
Review Complete
May 20, 2021
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Remove and replace Water Heater - 40 gal Gas Run water heater drain pan line to exterior of home and seal penetrations
50 tunnel below the foundation to replace entire drain system. 2 access holes - front back
Replacement of complete existing central heat and air system with or without duct work
Express: Remove + replace (10) existing windows and (6) doors like for like. No Remodel.
25 tunnel below the foundation to replace the utility to kitchen drain line. 1 access hole in back
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis