MCD27184
MCD27184 is a renovation/alteration project at 1165 N Saginaw Blvd, Saginaw, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 524 sq ft.
๐Project Metrics
TDLR #TABS2021017892Review Complete
Design review complete, construction may proceed
MCD27184 is a Renovation/Alteration project located at 1165 N Saginaw Blvd, Saginaw, TX 76179 in Saginaw, Texas. The project has an estimated value of $125K covering 524 sq ft. Lee Morris is the property owner and Pm Design Group is the design firm of record. The project was registered with TDLR on June 16, 2021.
โFrequently Asked Questions
What is MCD27184?
MCD27184 is a renovation/alteration project at 1165 N Saginaw Blvd in Saginaw, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Freezer addition and remodel of existing cooler and freezer in building.
Is MCD27184 open in Saginaw?
MCD27184 is currently under construction in Saginaw, TX. Its current TDLR status is "Review Complete".
Where is MCD27184 located?
MCD27184 is located at 1165 N Saginaw Blvd, Saginaw, TX, 76179, in Tarrant County.
Who is the owner or developer of MCD27184?
Lee Morris is the property owner/developer of record for MCD27184, per its TDLR project registration.
Who is the architect or design firm for MCD27184?
Pm Design Group is the design firm of record for MCD27184, according to its TDLR filing.
How much does MCD27184 cost and how big is it?
MCD27184 has an estimated construction value of $125K and approximately 524 square feet (about $239/sqft), based on its TDLR filing.
๐Scope of Work
Freezer addition and remodel of existing cooler and freezer in building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 16, 2021
Review Complete
Jun 16, 2021
Inspection Complete
Closed