Negley ES Improvements
๐Project Metrics
TDLR #TABS2021019487Project Closed
Project has been completed and closed
๐Scope of Work
Classroom Addition and Cafeteria expansion approximately 13,369 SF. Overall 29,580 SF includes Admin and Lounge renovations and flooring replacements including, Library and Gym, also playground relocations and outdoor learning and canopies.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$53.2M total๐Related City Permits
Building permits found at or near this location
Run new gas line approximately 31. Connect to gas meter with 1 galvanize pipe. Drill anchor hole through foundation skirt and hang 1 galvanized pipe. Added sediment trap to generator
Request to disconnect Install Automatic Transfer Switch w/ 200 Amp Breaker ~ ETJ ~ Use CDP
Replacement of an existing water heater
Express: Foundation Repair
23 tunnel for spot repair