ITO EN
ITO EN is a renovation/alteration project at 1320 Greenway Drive Suite 700, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2021). The project has an estimated value of $269K across about 7,534 sq ft.
๐Project Metrics
TDLR #TABS2021019852Project Closed
Project has been completed and closed
ITO EN is a Renovation/Alteration project located at 1320 Greenway Drive Suite 700, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $269K covering 7,534 sq ft. BOF TX TOWER 1320 LLC is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on July 15, 2021.
โFrequently Asked Questions
What is ITO EN?
ITO EN is a renovation/alteration project at 1320 Greenway Drive Suite 700 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant improvement
Is ITO EN open in Irving?
Construction on ITO EN is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2021. The building is finished and very likely open.
Where is ITO EN located?
ITO EN is located at 1320 Greenway Drive Suite 700, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of ITO EN?
BOF TX TOWER 1320 LLC is the property owner/developer of record for ITO EN, per its TDLR project registration.
Who is the architect or design firm for ITO EN?
Entos Design is the design firm of record for ITO EN, according to its TDLR filing.
How much does ITO EN cost and how big is it?
ITO EN has an estimated construction value of $269K and approximately 7,534 square feet (about $36/sqft), based on its TDLR filing.
๐Scope of Work
tenant improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 15, 2021
Review Complete
Inspection Complete
Closed
Sep 30, 2021