ACC Highland Campus Facilities offices is a renovation/alteration project at 6101 ACC Highland Campus Dr, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $100K across about 4,300 sq ft.
Project has been completed and closed
ACC Highland Campus Facilities offices is a Renovation/Alteration project located at 6101 ACC Highland Campus Dr, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $100K covering 4,300 sq ft. Austin Community College District is the property owner and Lym Miller Architecture is the design firm of record. The project was registered with TDLR on August 17, 2021.
ACC Highland Campus Facilities offices is a renovation/alteration project at 6101 ACC Highland Campus Dr in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation to existing Shell Space
Construction on ACC Highland Campus Facilities offices is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
ACC Highland Campus Facilities offices is located at 6101 ACC Highland Campus Dr, Austin, TX, 78752, in Travis County.
Austin Community College District is the property owner/developer of record for ACC Highland Campus Facilities offices, per its TDLR project registration.
Lym Miller Architecture is the design firm of record for ACC Highland Campus Facilities offices, according to its TDLR filing.
ACC Highland Campus Facilities offices has an estimated construction value of $100K and approximately 4,300 square feet (about $23/sqft), based on its TDLR filing.
Interior Renovation to existing Shell Space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 17, 2021
Review Complete
Inspection Complete
Closed
May 1, 2023
Building permits found at or near this location
QT - Install shade structures at existing school - OVA
Replacement of complete existing central heat and air system with or without duct work
Tunneling under home to replace cast iron sanitary piping for kitchen and bathrooms as well as replace or repairing copper water lines as needed. **We will be tunneling approximately 810 feet beneath the home with access located in the living room adjacent to the first-floor bathroom. The existing cast iron sanitary system will be replaced with approximately 200 feet of PVC piping. In addition the existing copper water distribution system will be abandoned and replaced with PEX piping
Replace 200amp panels replacing both meters junction gutter box grounding system and surge protection for both unit A and B Electric Provider - Austin Electric
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Two Stage Horizontal Heat Pump (Upstairs) LIKE FOR LIKE: 3 Ton Two Stage Vertical Gas (DOWNSTARIS) **TWO SYSTEM CHANGE OUT**