Final inspection completed, awaiting project closure
Manor ISD Early College High School Addition is a New Construction project located at 14832 FM 973, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $24.7M covering 83,206 sq ft. Manor ISD is the property owner and Claycomb Associates, Architects is the design firm of record. The project was registered with TDLR on September 13, 2021.
Early College High School addition to the Manor Senior High Campus site.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 13, 2021
Review Complete
Inspection Complete
Jul 28, 2023
Closed
Building permits found at or near this location
Tunnel under foundtation to repair failed drain lines
New 2 story sf residence with attached garage
Installing Back-Flow Preventor Only
New 2 Stry Sf Residence W/Att Garage & Porch
New 2 Stry Sf Residence W/Att Garage & Porch
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis