Manor New Tech Middle School Renovations
๐Project Metrics
TDLR #TABS2024010369Project Closed
Project has been completed and closed
๐Scope of Work
Interior remodel enclosing existing open classroom space into enclosed classrooms. Three floors. Includes the addition of a storefront wall separating the existing open classroom space from an adjacent corridor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$14.6M total๐Related City Permits
Building permits found at or near this location
4.2 kw Roof mounted solar system Main Service electrical upgrade 100AMP
Separate tenant electrical services only.
Mtech will create a tunnel with three access holes and make needed repairs to the main sewer line which is approximatley 120ft.
Install interior retro fit lighting to existing commercial only.
Replace service wire burnt up in meter socket.