Spectrum
Spectrum is a renovation/alteration project at 3148 State Highway 161, Suite 410, Grand Prairie, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $139K across about 2,771 sq ft.
๐Project Metrics
TDLR #TABS2022001440Project Closed
Project has been completed and closed
Spectrum is a Renovation/Alteration project located at 3148 State Highway 161, Suite 410, Grand Prairie, TX 75052 in Grand Prairie, Texas. The project has an estimated value of $139K covering 2,771 sq ft. Weber and Company is the property owner and Ware Malcomb is the design firm of record. The project was registered with TDLR on September 21, 2021.
โFrequently Asked Questions
What is Spectrum?
Spectrum is a renovation/alteration project at 3148 State Highway 161, Suite 410 in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate existing retail lease space.
Is Spectrum open in Grand Prairie?
Construction on Spectrum is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
Where is Spectrum located?
Spectrum is located at 3148 State Highway 161, Suite 410, Grand Prairie, TX, 75052, in Dallas County.
Who is the owner or developer of Spectrum?
Weber and Company is the property owner/developer of record for Spectrum, per its TDLR project registration.
Who is the architect or design firm for Spectrum?
Ware Malcomb is the design firm of record for Spectrum, according to its TDLR filing.
How much does Spectrum cost and how big is it?
Spectrum has an estimated construction value of $139K and approximately 2,771 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Renovate existing retail lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 21, 2021
Review Complete
Inspection Complete
Closed
Dec 31, 2021