Watermark
Watermark is a renovation/alteration project at 809 W 12th St, Ste. F, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $500K across about 10,188 sq ft.
๐Project Metrics
TDLR #TABS2022004393Project Closed
Project has been completed and closed
Watermark is a Renovation/Alteration project located at 809 W 12th St, Ste. F, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $500K covering 10,188 sq ft. LPC is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on November 2, 2021.
โFrequently Asked Questions
What is Watermark?
Watermark is a renovation/alteration project at 809 W 12th St, Ste. F in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel of existing space
Is Watermark open in Austin?
Construction on Watermark is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.
Where is Watermark located?
Watermark is located at 809 W 12th St, Ste. F, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Watermark?
LPC is the property owner/developer of record for Watermark, per its TDLR project registration.
Who is the architect or design firm for Watermark?
S. Tipton Studio is the design firm of record for Watermark, according to its TDLR filing.
How much does Watermark cost and how big is it?
Watermark has an estimated construction value of $500K and approximately 10,188 square feet (about $49/sqft), based on its TDLR filing.
๐Scope of Work
remodel of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 2, 2021
Review Complete
Inspection Complete
Closed
Jul 31, 2022
๐Related Projects
๐คSame Owner
$3.0M total๐Related City Permits
Building permits found at or near this location
Install illuminated D/F monument sign reading WINDSOR SOUTH LAMAR APARTMENTS
Application 2. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is NOT getting built out. This is the only permit for Suite 310.
Application 1. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is NOT getting built out. This is the only permit for Suite 300.
Application 3. This permit is only for the finish out of the elevator lobby and the building corridor.
Tpole for remodel job. they are replacing exterior siting so we need to get tpole connecdted and house disconnected. Thank you Travis Bade 5127316088