๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

Paggi House

200 Lee Barton Drive, Austin, TX 78704, Austin, TX, 78704
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022004442
$500K
Project Value
4,075
Square Feet
$123/sqft
Cost/SqFt
2y 4mo
Duration
Registered:Nov 2, 2021
Start:Feb 1, 2022
Target:Jun 1, 2024
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

New roof addition and covered courtyard expansion.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 2, 2021
Review Complete
November 2, 2021
Construction Start
February 1, 2022
Expected Completion
June 1, 2024

๐Ÿ“Location & Views

Open in MapsGet Directions|30.26309, -97.75689

๐Ÿ“„Related City Permits

Building permits found at or near this location

210 LEE BARTON DR UNIT 515
Same location

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutJan 2026
View Details
2025-029163 MP
๐Ÿ”งFox Service Company
210 LEE BARTON DR UNIT 607
Same location

Replacement of complete existing central heat and air system with or without duct work HVAC Changeout Replacing like for like 3T Heat Pump

FinalMechanical PermitChange OutDec 2025
View Details
2025-155261 MP
๐Ÿ”งFreedom Power
210 LEE BARTON DR UNIT 208
Same location

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutSep 2025
View Details
2025-112157 MP
๐Ÿ”งSA&H Western Holdings, LLC
210 LEE BARTON DR UNIT 508
Same location

In this condominium the owner wants us to upgrade the microwave from 120volt 20 amp to 240 volt 30 amp and replacing the 120v 20 amp circuit at existing gas cooktop to a 50 amp 240v cooktop/range setup in her kitchen. In the condo there is a 32 circuit GE 200 amp main lug only panel that we will utilize to feed these upgraded circuits that is around 50 away in distance. There is no attic access so we will need to cut sheetrock to fish wiring through attic. Panel load will now be 130 amps.

FinalElectrical PermitRepairJun 2025
View Details
2025-069110 EP
๐Ÿ”งAMD Electrical Contracting, Llc
210 LEE BARTON DR UNIT 311
Same location

Replacement of complete existing central heat and air system with or without duct work Mechanical HVAC change-out like for like 2.5 ton vertical electric split

FinalMechanical PermitChange OutJan 2025
View Details
2024-167792 MP
๐Ÿ”งGoettl Air Conditioning & Plumbing

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists