US 62 is a renovation/alteration project at Memphis Ave to East of IH 27, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $25.0M across about 20,000 sq ft.
Final inspection completed, awaiting project closure
US 62 is a Renovation/Alteration project located at Memphis Ave to East of IH 27, Lubbock, TX 79406 in Lubbock, Texas. The project has an estimated value of $25.0M covering 20,000 sq ft. TxDOT District: Lubbock is the property owner and American Structurepoint Inc. is the design firm of record. The project was registered with TDLR on November 17, 2021.
US 62 is a renovation/alteration project at Memphis Ave to East of IH 27 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation and beautification of US 62 incorporating pedestrian elements, signs and pavement markings.
Construction on US 62 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
US 62 is located at Memphis Ave to East of IH 27, Lubbock, TX, 79406, in Lubbock County.
TxDOT District: Lubbock is the property owner/developer of record for US 62, per its TDLR project registration.
American Structurepoint Inc. is the design firm of record for US 62, according to its TDLR filing.
US 62 has an estimated construction value of $25.0M and approximately 20,000 square feet (about $1.25K/sqft), based on its TDLR filing.
Rehabilitation and beautification of US 62 incorporating pedestrian elements, signs and pavement markings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 17, 2021
Review Complete
Nov 17, 2021
Inspection Complete
Jun 10, 2026
Closed
1666d
Construction phase