Project intelligenceTDLR TABS2026008435New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Upland Avenue (CSJ: 0905-06-096) in Lubbock, TX

From: 82nd Street To: 98th Street, Lubbock, TX, 79424

Opening ~Sep 2027Review Complete

Upland Avenue (CSJ: 0905-06-096) is a new construction project at From: 82nd Street To: 98th Street, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2027. The project has an estimated value of $16.4M across about 93,753 sq ft.

Estimated project value
$16.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
93,753 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$175/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 18, 2025638 days across supplied datesSep 17, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    131 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    501 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Upland Avenue (CSJ: 0905-06-096)

TxDOT District: Lubbock is widening Upland Avenue from 82nd Street to 98th Street, a project filed as CSJ: 0905-06-096. This new construction effort involves expanding the non-freeway corridor from two lanes to five. The work includes concrete paving, hot-mix asphalt, sidewalks, ADA curb ramps, driveways, structures, signals, illumination, signs, and pavement markings.

The project is registered with TDLR and has a status of Review Complete, with plan review finished in December 2025. Construction is scheduled to finish in September 2027, with work starting in May 2026. The estimated cost for this infrastructure upgrade is $16,366,431. The filing lists a square footage of 93,753 sq ft, resulting in a cost per square foot of $175.

Project Scope and Location

Located in Lubbock, TX 79424, within Lubbock County, this roadway improvement is significant in scale. The registered accessibility specialist for the project is Frank Fonseca. The funding source involves public funds, public land, or Federally funded roadway project criteria. This specific project is part of a larger portfolio managed by TxDOT District: Lubbock, which has six other TDLR-registered projects totaling $279,715,561 in estimated costs.

Regional Context and Comparison

In Lubbock County, the median estimated cost for new construction filings is $800,000. This project's cost is above the county median for its type, placing it in the top quarter of filings. The median size for these projects is 5,275 sq ft, while this project is substantially larger at 93,753 sq ft. The median scheduled build window is 244 days, whereas this project's window is 501 days, which is longer than the county median. The cost per square foot of $175 is close to the county median of $175.

The area profile for ZIP 79424 shows a population of about 52,336 and a median household income of $94,703. There are approximately 22,800 housing units in the area, with housing mostly owner-occupied and a median owner-occupied home value of $279,600. The Lubbock County unemployment rate was 4.3 percent in July 2026, higher than a year earlier. These demographic and economic factors provide context for the infrastructure investment in this specific corridor.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79424 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

Upland Avenue (CSJ: 0905-06-096) is a New Construction project located at From: 82nd Street To: 98th Street, Lubbock, TX 79424 in Lubbock, Texas. The project has an estimated value of $16.4M covering 93,753 sq ft. TxDOT District: Lubbock is the property owner. The project was registered with TDLR on December 18, 2025.

Frequently Asked Questions

When is the Upland Avenue widening scheduled to finish?

Construction is scheduled to finish in September 2027, with work starting in May 2026. Plan review was completed in December 2025.

What is the estimated cost of this project?

The estimated cost is $16,366,431. This figure places the project in the top quarter of new construction filings in Lubbock County.

Who is the owner of record for this work?

The owner of record is TxDOT District: Lubbock. Frank Fonseca is the registered accessibility specialist listed on the filing.

Is the project currently open to traffic?

The TDLR record indicates the project status is Review Complete, with construction scheduled to start in May 2026. It is not described as open or operating.

What is Upland Avenue (CSJ: 0905-06-096)?

Upland Avenue (CSJ: 0905-06-096) is a new construction project at From: 82nd Street To: 98th Street in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen non-freeway from two lanes to five lanes consisting of: concrete paving, hot-mix, sidewalk, ADA curb ramps, driveways, structures, signals, illumination, signs and pavement markings.

Is Upland Avenue (CSJ: 0905-06-096) open in Lubbock?

Upland Avenue (CSJ: 0905-06-096) is still under construction in Lubbock, TX, with an estimated completion of Sep 2027 according to its TDLR registration.

Where is Upland Avenue (CSJ: 0905-06-096) located?

Upland Avenue (CSJ: 0905-06-096) is located at From: 82nd Street To: 98th Street, Lubbock, TX, 79424, in Lubbock County.

Who is the owner or developer of Upland Avenue (CSJ: 0905-06-096)?

TxDOT District: Lubbock is the property owner/developer of record for Upland Avenue (CSJ: 0905-06-096), per its TDLR project registration.

How much does Upland Avenue (CSJ: 0905-06-096) cost and how big is it?

Upland Avenue (CSJ: 0905-06-096) has an estimated construction value of $16.4M and approximately 93,753 square feet (about $175/sqft), based on its TDLR filing.

Scope of Work

Widen non-freeway from two lanes to five lanes consisting of: concrete paving, hot-mix, sidewalk, ADA curb ramps, driveways, structures, signals, illumination, signs and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: 82nd Street To: 98th Street, Lubbock, TX, 79424

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79424 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.