Interport 71/130 Multifamily Development is a new construction project at 11701 1/2 Dionda Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $78.9M across about 443,216 sq ft.
Project has been completed and closed
Interport 71/130 Multifamily Development is a New Construction project located at 11701 1/2 Dionda Lane, Austin, TX 78617 in Austin, Texas. The project has an estimated value of $78.9M covering 443,216 sq ft. GEP XI Interport, LP is the property owner and Meeks + Partners is the design firm of record. The project was registered with TDLR on December 3, 2021.
Interport 71/130 Multifamily Development is a new construction project at 11701 1/2 Dionda Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 396 unit garden apartment development. 443,216 SF of gross building across a 15.35 property.
Construction on Interport 71/130 Multifamily Development is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.
Interport 71/130 Multifamily Development is located at 11701 1/2 Dionda Lane, Austin, TX, 78617, in Travis County.
GEP XI Interport, LP is the property owner/developer of record for Interport 71/130 Multifamily Development, per its TDLR project registration.
Meeks + Partners is the design firm of record for Interport 71/130 Multifamily Development, according to its TDLR filing.
Interport 71/130 Multifamily Development has an estimated construction value of $78.9M and approximately 443,216 square feet (about $178/sqft), based on its TDLR filing.
396 unit garden apartment development. 443,216 SF of gross building across a 15.35 property.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 3, 2021
Review Complete
Inspection Complete
Closed
Oct 31, 2024
Building permits found at or near this location
Replace a gas line in the leasingoffice which is Building 11
Emergency repair to replace main breaker on building 4 MC 4B (2023-020748) Approved by Hyatt Dunn
NEMA 14-50 outlet installation in the garage. The outlet will be connected to the existing subpanel using a 40A GFCI breaker for a 32A EV charger. The subpanel does not serve heavy loads (such as a dryer or AC unit) and is protected by a 60A breaker in the main panel. The main service panel has a 200A main breaker and is located on the opposite side of the house.
Replacement of complete existing central heat and air system with or without duct work
build rack 3 meters 200 amps AE wo#663894 11701 FM 812 RD UNIT D E F