Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg.
Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. is a renovation/alteration project at 3700 Lake Austin Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2022). The project has an estimated value of $50K across about 1,125 sq ft.
๐Project Metrics
TDLR #TABS2022006591Project Closed
Project has been completed and closed
Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. is a Renovation/Alteration project located at 3700 Lake Austin Blvd., Austin, TX 78703 in Austin, Texas. The project has an estimated value of $50K covering 1,125 sq ft. Lower Colorado River Authority is the property owner and Pape-Dawson Engineers is the design firm of record. The project was registered with TDLR on December 3, 2021.
โFrequently Asked Questions
What is Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg.?
Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. is a renovation/alteration project at 3700 Lake Austin Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace non-compliant pedestrian paths of travel as identified by a accessibility survey completed for the site.
Is Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. open in Austin?
Construction on Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2022. The building is finished and very likely open.
Where is Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. located?
Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. is located at 3700 Lake Austin Blvd., Austin, TX, 78703, in Travis County.
Who is the owner or developer of Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg.?
Lower Colorado River Authority is the property owner/developer of record for Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg., per its TDLR project registration.
Who is the architect or design firm for Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg.?
Pape-Dawson Engineers is the design firm of record for Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg., according to its TDLR filing.
How much does Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. cost and how big is it?
Lower Colorado River Authority GOC Exterior Upgrades - Miller Bldg. has an estimated construction value of $50K and approximately 1,125 square feet (about $44/sqft), based on its TDLR filing.
๐Scope of Work
Replace non-compliant pedestrian paths of travel as identified by a accessibility survey completed for the site.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 3, 2021
Review Complete
Inspection Complete
Closed
Mar 24, 2022
๐Related Projects
๐คSame Owner
$38.8M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change out NG water heater like for like
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Per AISD 2022 Bond Language Secure entry vestibule upgrades storefront and glazing installation Life safety and security improvements Heating and air conditioning Electrical Plumbing improvements Building exterior improvements Roofing replacement
Replacement of complete existing central heat and air system with or without duct work