Spec Suite 245
Spec Suite 245 is a renovation/alteration project at 524 Lamar Blvd. Suite 245, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2022). The project has an estimated value of $60K across about 1,270 sq ft.
๐Project Metrics
TDLR #TABS2022007069Project Closed
Project has been completed and closed
Spec Suite 245 is a Renovation/Alteration project located at 524 Lamar Blvd. Suite 245, Arlington, TX 76011 in Arlington, Texas. The project has an estimated value of $60K covering 1,270 sq ft. FN Lamar, LLC. is the property owner and GSO Architects, Inc. is the design firm of record. The project was registered with TDLR on December 10, 2021.
โFrequently Asked Questions
What is Spec Suite 245?
Spec Suite 245 is a renovation/alteration project at 524 Lamar Blvd. Suite 245 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Spec Suite 245 finishout
Is Spec Suite 245 open in Arlington?
Construction on Spec Suite 245 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2022. The building is finished and very likely open.
Where is Spec Suite 245 located?
Spec Suite 245 is located at 524 Lamar Blvd. Suite 245, Arlington, TX, 76011, in Tarrant County.
Who is the owner or developer of Spec Suite 245?
FN Lamar, LLC. is the property owner/developer of record for Spec Suite 245, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 245?
GSO Architects, Inc. is the design firm of record for Spec Suite 245, according to its TDLR filing.
How much does Spec Suite 245 cost and how big is it?
Spec Suite 245 has an estimated construction value of $60K and approximately 1,270 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
Spec Suite 245 finishout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2021
Review Complete
Inspection Complete
Closed
Feb 28, 2022