Third Coast Bank
Third Coast Bank is a renovation/alteration project at 420 Broadway, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $900K across about 16,802 sq ft.
๐Project Metrics
TDLR #TABS2022009582Project Closed
Project has been completed and closed
Third Coast Bank is a Renovation/Alteration project located at 420 Broadway, San Antonio, TX 78205 in San Antonio, Texas. The project has an estimated value of $900K covering 16,802 sq ft. Graystreet is the property owner and ID Studio 4 is the design firm of record. The project was registered with TDLR on January 19, 2022.
โFrequently Asked Questions
What is Third Coast Bank?
Third Coast Bank is a renovation/alteration project at 420 Broadway in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant finish out of 1st and fourth floor
Is Third Coast Bank open in San Antonio?
Construction on Third Coast Bank is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.
Where is Third Coast Bank located?
Third Coast Bank is located at 420 Broadway, San Antonio, TX, 78205, in Bexar County.
Who is the owner or developer of Third Coast Bank?
Graystreet is the property owner/developer of record for Third Coast Bank, per its TDLR project registration.
Who is the architect or design firm for Third Coast Bank?
ID Studio 4 is the design firm of record for Third Coast Bank, according to its TDLR filing.
How much does Third Coast Bank cost and how big is it?
Third Coast Bank has an estimated construction value of $900K and approximately 16,802 square feet (about $54/sqft), based on its TDLR filing.
๐Scope of Work
tenant finish out of 1st and fourth floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 19, 2022
Review Complete
Inspection Complete
Closed
Jul 8, 2022