Southwest Key HQ Renovations
📊Project Metrics
TDLR #TABS2022009902Review Complete
Design review complete, construction may proceed
📋Scope of Work
Renovation of open areas to create 2 offices and workstations, renovation of 3 classroom spaces to create workstation area and interior renovation of annex building from classrooms to offices with work areas.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Located in hallway with pull down stairs.
Disconnect/Reconnect request for replacing 200 amp meter can and upgrading 200 amp main service panel.
Install 7.65 kW rooftop solar system to existing residential only.
Replacement of complete existing central heat and air system with or without duct work Front unit equipment replace only
interior remodel - Kitchen remodel to replace all cabinetry countertops. replace sink in existing location. Relocate the door into the pantry. Add a few recessed cans to the kitchen breakfast Nook and Living.