LASA HS- Renovations to Existing Eastside HS Campus
๐Project Metrics
TDLR #TABS2021012116Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
LEVEL 1 & 2 ALTERATIONS TO THE EXISTING CAMPUS. INTERIOR SCOPE INCLUDES RECONFIGURATION OF OFFICES IN THE ADMIN WING, CLASSROOMS, LIBRARY, AND GYM SPACES. EXTERIOR SCOPE INCLUDES MODIFICATION TO SIGNAGE, FACADE, AND RE-STRIPING OF PARKING LOT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Related City Permits
Building permits found at or near this location
Re-Roof Residence
Replacement of complete existing central heat and air system with or without duct work
Austin Water Violation Plumbing Permit
Change out HVAC system to existing residence only.
window installation