Copeland Park Improvements
๐Project Metrics
TDLR #TABS2022010590Project Closed
Project has been completed and closed
๐Scope of Work
Prefab Pavilion improvements and skate spot improvements with concrete flat work and prefab skating elements at an existing park
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
ePlan Review: Finish Out for Office (with Model Unit) - Suite 1100
Homebuilder loop for residential remodel/addition. Ref 2025-077090 BP
Addition/remodel. 2-story addition to rear/side of existing noncomplying single family residence. Addition will consist of a new primary suite half bathroom laundry room covered decks and enlarged kitchen and dining room on 1st floor and 2 bedrooms 2 bathrooms and a balcony on the 2nd floor. Remodel kitchen and reconfigure layout to accommodate addition. Addition/remodel will result in a 5 bedroom 4.5 bathroom single family residence.
Addition/remodel. 2-story addition to rear/side of existing noncomplying single family residence. Addition will consist of a new primary suite half bathroom laundry room covered decks and enlarged kitchen and dining room on 1st floor and 2 bedrooms 2 bathrooms and a balcony on the 2nd floor. Remodel kitchen and reconfigure layout to accommodate addition. Addition/remodel will result in a 5 bedroom 4.5 bathroom single family residence.
Replace devices throughout the house. Upgrade to AFCI & GFCI as needed. Add (1) EV Charger outlet & (1) 240v Range outlet.