STX 9
STX 9 is a renovation/alteration project at 6401 S U S HY 183, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2022). The project has an estimated value of $10.0M across about 205,350 sq ft.
๐Project Metrics
TDLR #TABS2022010833Project Closed
Project has been completed and closed
STX 9 is a Renovation/Alteration project located at 6401 S U S HY 183, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $10.0M covering 205,350 sq ft. KR Easton Austin Highway 183 2020 is the property owner and CESO, Inc. is the design firm of record. The project was registered with TDLR on February 2, 2022.
โFrequently Asked Questions
What is STX 9?
STX 9 is a renovation/alteration project at 6401 S U S HY 183 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Alteration for a Package Delivery Service.
Is STX 9 open in Austin?
Construction on STX 9 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2022. The building is finished and very likely open.
Where is STX 9 located?
STX 9 is located at 6401 S U S HY 183, Austin, TX, 78744, in Travis County.
Who is the owner or developer of STX 9?
KR Easton Austin Highway 183 2020 is the property owner/developer of record for STX 9, per its TDLR project registration.
Who is the architect or design firm for STX 9?
CESO, Inc. is the design firm of record for STX 9, according to its TDLR filing.
How much does STX 9 cost and how big is it?
STX 9 has an estimated construction value of $10.0M and approximately 205,350 square feet (about $49/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Alteration for a Package Delivery Service.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 2, 2022
Review Complete
Inspection Complete
Closed
Sep 1, 2022
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Requesting a permit for the installation of a new meter can 125-amp disconnect and panel for a sump pump.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1722
AISD Sadler Means ES Irrigation Permit
Connect Mobile Home with decks 80 sq ft
Connect Mobile Home with decks 80 sq ft