Divcowest Spec Suite is a renovation/alteration project at 2043 S Lamar Blvd. Suite 125, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2022). The project has an estimated value of $850K across about 850 sq ft.
Project has been completed and closed
Divcowest Spec Suite is a Renovation/Alteration project located at 2043 S Lamar Blvd. Suite 125, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $850K covering 850 sq ft. DIVCOWEST is the property owner and Gensler is the design firm of record. The project was registered with TDLR on February 18, 2022.
Divcowest Spec Suite is a renovation/alteration project at 2043 S Lamar Blvd. Suite 125 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Small tenant interior fit out.
Construction on Divcowest Spec Suite is complete โ TDLR records show the project passed its required accessibility inspection in May 2022. The building is finished and very likely open.
Divcowest Spec Suite is located at 2043 S Lamar Blvd. Suite 125, Austin, TX, 78704, in Travis County.
DIVCOWEST is the property owner/developer of record for Divcowest Spec Suite, per its TDLR project registration.
Gensler is the design firm of record for Divcowest Spec Suite, according to its TDLR filing.
Divcowest Spec Suite has an estimated construction value of $850K and approximately 850 square feet (about $1.00K/sqft), based on its TDLR filing.
Small tenant interior fit out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 18, 2022
Review Complete
Inspection Complete
Closed
May 28, 2022
Building permits found at or near this location
Interior build out of business office. MODIFICATIONS TO AREAS OF OPEN WORKSTATION. CONFERECE ROOMS AND STORAGE AREA. FINISH LEVEL FOR THE PROJECT IS CONSIDERED AS MID LEVEL WITH OFFICE FINISH MATCHING THROUGHOUT
Interior build out of business office. MODIFICATIONS TO AREAS OF OPEN WORKSTATION. CONFERECE ROOMS AND STORAGE AREA. FINISH LEVEL FOR THE PROJECT IS CONSIDERED AS MID LEVEL WITH OFFICE FINISH MATCHING THROUGHOUT
Interior build out of business office. MODIFICATIONS TO AREAS OF OPEN WORKSTATION. CONFERECE ROOMS AND STORAGE AREA. FINISH LEVEL FOR THE PROJECT IS CONSIDERED AS MID LEVEL WITH OFFICE FINISH MATCHING THROUGHOUT
Interior build out of business office. MODIFICATIONS TO AREAS OF OPEN WORKSTATION. CONFERECE ROOMS AND STORAGE AREA. FINISH LEVEL FOR THE PROJECT IS CONSIDERED AS MID LEVEL WITH OFFICE FINISH MATCHING THROUGHOUT
Install Access Control - Electronic Locks for Floor 4