Riata 4
Riata 4 is a renovation/alteration project at 12331 Riata Trace Parkway, Bldg. 4, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $665K across about 4,110 sq ft.
๐Project Metrics
TDLR #TABS2022012921Project Closed
Project has been completed and closed
Riata 4 is a Renovation/Alteration project located at 12331 Riata Trace Parkway, Bldg. 4, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $665K covering 4,110 sq ft. Endeavor Real Estate Group is the property owner and Studio8 Architects is the design firm of record. The project was registered with TDLR on March 1, 2022.
โFrequently Asked Questions
What is Riata 4?
Riata 4 is a renovation/alteration project at 12331 Riata Trace Parkway, Bldg. 4 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Lobby refresh and light electrical work
Is Riata 4 open in Austin?
Construction on Riata 4 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.
Where is Riata 4 located?
Riata 4 is located at 12331 Riata Trace Parkway, Bldg. 4, Austin, TX, 78727, in Travis County.
Who is the owner or developer of Riata 4?
Endeavor Real Estate Group is the property owner/developer of record for Riata 4, per its TDLR project registration.
Who is the architect or design firm for Riata 4?
Studio8 Architects is the design firm of record for Riata 4, according to its TDLR filing.
How much does Riata 4 cost and how big is it?
Riata 4 has an estimated construction value of $665K and approximately 4,110 square feet (about $162/sqft), based on its TDLR filing.
๐Scope of Work
Lobby refresh and light electrical work
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 1, 2022
Review Complete
Inspection Complete
Closed
Jan 1, 2023
๐Related Projects
๐คSame Owner
$777.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Suefang Eseng
Interior Remodel Existing Accessory Medical Office Training Facility Suite 200
Interior renovation to existing building suite.
Interior Remodel Existing Accessory Medical Office Training Facility Suite 100
Interior Remodel Existing Accessory Medical Office Training Facility Suite 100