📝Review Complete🏗️ New Construction💵 This project is privately funded, on private land for private use.

Green Sprout Preschool Addition

2108 E.M. Franklin Ave, Austin, TX 78723, Austin, TX, 78723
Construction50%

📊Project Metrics

TDLR #TABS2022013930
$700K
Project Value
800
Square Feet
$875/sqft
Cost/SqFt
2y 6mo
Duration
Registered:Mar 11, 2022
Start:Jun 1, 2022
Target:Nov 17, 2024
📝

Review Complete

Design review complete, construction may proceed

📋Scope of Work

Construction of a new building with multi-purpose room, break room, and bathroom

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
March 11, 2022
Construction Start
June 1, 2022
Expected Completion
November 17, 2024

📄Related City Permits

Building permits found at or near this location

2108 BALTUSROL DR

Upgrade electrical service to 200a

FinalElectrical PermitUpgradeDec 2025
View Details
2025-160651 EP
🔧Volthouse Eletric LLC
2108 LEMON DR BLDG 2

Secondary Mechanical Contractor installing walk in cooler/freezer and install 2 refrigeration systems only for permit 2025-013392 BP

ActiveMechanical PermitRepairDec 2025
View Details
2025-155341 MP
🔧Boyd Refrigeration, LLC
2108 TILLERY ST UNIT 2104

Installing a generator interlock kit on the indoor laundry room panel to connect a portable battery backup system. Work includes converting the existing indoor panel (which is currently fed from an outside disconnect) to a main breaker using an Eaton CSR2200N kit. I will install the manufacturer-approved mechanical interlock plate and a new 30-amp breaker. I am also installing a 30-amp power inlet on the wall next to the panel. No work will be performed on the outside main service disconnect or meter.

ActiveElectrical PermitRepairDec 2025
View Details
2025-154424 EP
2108 PRATHER LN

Demo old driveway. Construct new driveway approach of 20 FT

FinalDriveway / SidewalksNewNov 2025
View Details
2025-143763 DS
2108 LANIER DR

Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with SCH 40 PVC. There will be (2-3) access holes on the right and left sides of the house.

FinalPlumbing PermitRepairOct 2025
View Details
2025-125459 PP
🔧Peanut Plumbing LLC