D7 Roofing
D7 Roofing is a renovation/alteration project at 1820 Redwood Rd., San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 5,000 sq ft.
๐Project Metrics
TDLR #TABS2022017431Review Complete
Design review complete, construction may proceed
D7 Roofing is a Renovation/Alteration project located at 1820 Redwood Rd., San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $250K covering 5,000 sq ft. D7 Roofing is the property owner and Bryan Horn Architect is the design firm of record. The project was registered with TDLR on April 25, 2022.
โFrequently Asked Questions
What is D7 Roofing?
D7 Roofing is a renovation/alteration project at 1820 Redwood Rd. in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1st and 2nd floor interior build-out.
Is D7 Roofing open in San Marcos?
D7 Roofing is currently under construction in San Marcos, TX. Its current TDLR status is "Review Complete".
Where is D7 Roofing located?
D7 Roofing is located at 1820 Redwood Rd., San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of D7 Roofing?
D7 Roofing is the property owner/developer of record for D7 Roofing, per its TDLR project registration.
Who is the architect or design firm for D7 Roofing?
Bryan Horn Architect is the design firm of record for D7 Roofing, according to its TDLR filing.
How much does D7 Roofing cost and how big is it?
D7 Roofing has an estimated construction value of $250K and approximately 5,000 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
1st and 2nd floor interior build-out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 25, 2022
Review Complete
Apr 25, 2022
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
New 2-Story Duplex Bldg 2 Unit B (2nd floor) New duplex unit 2 bed/2 bath with kitchen and living room
Addition/remodel is existing 1-story single family residence add bedroom bathroom laundry room and carports 3 Bed/2.5 bath
New 2-Story Duplex Bldg 2 Unit A (1st floor) New duplex unit 1 bed/1 bath with kitchen living room and attached porch
Replace panels to copper for unit A and B We will replace the 100a breaker panels for both Unit A and Unit B. 5/12/26 SM - Unit C power is impacted by disconnect/ reconnect. Ensure service conductors are sized to serve all 3 disconnects.
Addition/remodel is existing 1-story single family residence add bedroom bathroom laundry room and carports 3 Bed/2.5 bath