Spec Suite 350
Spec Suite 350 is a renovation/alteration project at 2600 Via Fortuna, Building 1, Suite 350, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $172K across about 2,877 sq ft.
๐Project Metrics
TDLR #TABS2022019969Project Closed
Project has been completed and closed
Spec Suite 350 is a Renovation/Alteration project located at 2600 Via Fortuna, Building 1, Suite 350, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $172K covering 2,877 sq ft. Cousins Properties is the property owner and STG Design is the design firm of record. The project was registered with TDLR on May 25, 2022.
โFrequently Asked Questions
What is Spec Suite 350?
Spec Suite 350 is a renovation/alteration project at 2600 Via Fortuna, Building 1, Suite 350 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel
Is Spec Suite 350 open in Austin?
Construction on Spec Suite 350 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is Spec Suite 350 located?
Spec Suite 350 is located at 2600 Via Fortuna, Building 1, Suite 350, Austin, TX, 78746, in Travis County.
Who is the owner or developer of Spec Suite 350?
Cousins Properties is the property owner/developer of record for Spec Suite 350, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 350?
STG Design is the design firm of record for Spec Suite 350, according to its TDLR filing.
How much does Spec Suite 350 cost and how big is it?
Spec Suite 350 has an estimated construction value of $172K and approximately 2,877 square feet (about $60/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 25, 2022
Review Complete
Inspection Complete
Closed
Aug 31, 2022
๐Related Projects
๐คSame Owner
$581.2M total๐๏ธSame Design Firm
$4.94B total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Existing 200 amp underground service is having problems and needs to be replaced. AE disconnect will be needed.
To replace residential service from an overhead service to an underground service going through the back yard to the propertys owners home. The underground run will go around the exterior of the back yard and avoid running through the center of the backyard going to the panel.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System