AMAT B37 Metrology Lab is a renovation/alteration project at 9700 US 290, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2023). The project has an estimated value of $5.0M across about 21,500 sq ft.
Project has been completed and closed
AMAT B37 Metrology Lab is a Renovation/Alteration project located at 9700 US 290, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $5.0M covering 21,500 sq ft. Applied Materials is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on June 8, 2022.
AMAT B37 Metrology Lab is a renovation/alteration project at 9700 US 290 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing warehouse area into a metrology lab and offices.
Construction on AMAT B37 Metrology Lab is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2023. The building is finished and very likely open.
AMAT B37 Metrology Lab is located at 9700 US 290, Austin, TX, 78724, in Travis County.
Applied Materials is the property owner/developer of record for AMAT B37 Metrology Lab, per its TDLR project registration.
Fuse Architecture Studio is the design firm of record for AMAT B37 Metrology Lab, according to its TDLR filing.
AMAT B37 Metrology Lab has an estimated construction value of $5.0M and approximately 21,500 square feet (about $233/sqft), based on its TDLR filing.
Renovation of existing warehouse area into a metrology lab and offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 8, 2022
Review Complete
Inspection Complete
Closed
Feb 1, 2023
Building permits found at or near this location
Rip and replace fiber optic cable on cell tower ground cabinets trenching for new conduit.
INSTALL NEW 200 AMP PANELBOARD FOR B34 CSMG MF TEST BAY.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3T horizontal gas two stage system (downstairs)
install water softener at residence
install sprinkler system