Another Broken Egg at The Linc
Another Broken Egg at The Linc is a renovation/alteration project at 6406 N IH-35 Frontage Road Suite 1600, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2023). The project has an estimated value of $600K across about 3,700 sq ft.
๐Project Metrics
TDLR #TABS2022021219Project Closed
Project has been completed and closed
Another Broken Egg at The Linc is a Renovation/Alteration project located at 6406 N IH-35 Frontage Road Suite 1600, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $600K covering 3,700 sq ft. LED LINC LLC is the property owner and Framework Architects is the design firm of record. The project was registered with TDLR on June 11, 2022.
โFrequently Asked Questions
What is Another Broken Egg at The Linc?
Another Broken Egg at The Linc is a renovation/alteration project at 6406 N IH-35 Frontage Road Suite 1600 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New brunch restaurant fit out
Is Another Broken Egg at The Linc open in Austin?
Construction on Another Broken Egg at The Linc is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2023. The building is finished and very likely open.
Where is Another Broken Egg at The Linc located?
Another Broken Egg at The Linc is located at 6406 N IH-35 Frontage Road Suite 1600, Austin, TX, 78752, in Travis County.
Who is the owner or developer of Another Broken Egg at The Linc?
LED LINC LLC is the property owner/developer of record for Another Broken Egg at The Linc, per its TDLR project registration.
Who is the architect or design firm for Another Broken Egg at The Linc?
Framework Architects is the design firm of record for Another Broken Egg at The Linc, according to its TDLR filing.
How much does Another Broken Egg at The Linc cost and how big is it?
Another Broken Egg at The Linc has an estimated construction value of $600K and approximately 3,700 square feet (about $162/sqft), based on its TDLR filing.
๐Scope of Work
New brunch restaurant fit out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 11, 2022
Review Complete
Inspection Complete
Closed
Feb 1, 2023
๐Related Projects
๐คSame Owner
$4.0M total๐Related City Permits
Building permits found at or near this location
Express: Remove and replace 16 windows (like for like)
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA