Enamel Dental
Enamel Dental is a renovation/alteration project at 14008 Shadow Glen Blvd., Suite #203, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $200K across about 2,115 sq ft.
๐Project Metrics
TDLR #TABS2022023030Review Complete
Design review complete, construction may proceed
Enamel Dental is a Renovation/Alteration project located at 14008 Shadow Glen Blvd., Suite #203, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $200K covering 2,115 sq ft. Parker Dunn is the property owner and Bryan Horn Architect is the design firm of record. The project was registered with TDLR on July 6, 2022.
โFrequently Asked Questions
What is Enamel Dental?
Enamel Dental is a renovation/alteration project at 14008 Shadow Glen Blvd., Suite #203 in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel.
Is Enamel Dental open in Manor?
Enamel Dental is currently under construction in Manor, TX. Its current TDLR status is "Review Complete".
Where is Enamel Dental located?
Enamel Dental is located at 14008 Shadow Glen Blvd., Suite #203, Manor, TX, 78653, in Travis County.
Who is the owner or developer of Enamel Dental?
Parker Dunn is the property owner/developer of record for Enamel Dental, per its TDLR project registration.
Who is the architect or design firm for Enamel Dental?
Bryan Horn Architect is the design firm of record for Enamel Dental, according to its TDLR filing.
How much does Enamel Dental cost and how big is it?
Enamel Dental has an estimated construction value of $200K and approximately 2,115 square feet (about $95/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 6, 2022
Review Complete
Jul 6, 2022
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.0M total๐Related City Permits
Building permits found at or near this location
Installing a new irrigation system
Plumbing for New Construction of SFR in the ETJ. 2439 sq ft
New Construction of SFR in ETJ
HBL ETJ NO BP
Install new roof-mounted solar and energy storage system to existing single family residence. Underground. Pedernales Electric Cooperative