โœ…Inspection Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

Ascension Catholic Church - Office Remodel

804 Pine Street, Bastrop, TX 78602, Bastrop, TX, 78602
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022025249
$300K
Project Value
1,638
Square Feet
$183/sqft
Cost/SqFt
6 months
Duration
Registered:Aug 3, 2022
Start:Oct 3, 2022
Target:Mar 31, 2023
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

Interior Remodel of existing space for use as Offices for Church Staff.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 3, 2022
Inspection Complete
March 31, 2023
Construction Start
October 3, 2022
Expected Completion
March 31, 2023

๐Ÿ“Location & Views

Open in MapsGet Directions|30.10952, -97.31862

๐Ÿ“„Related City Permits

Building permits found at or near this location

804 WALLER ST
26.88 mi away

*Change of Use* Addition/remodel. 2-story addition to rear of existing 1-story single family residence. Addition will consist of a bedroom and covered deck on 1st floor and an office on the 2nd floor. Addition/remodel will result in a 3 bedroom 2 bathroom small lot single family residence.

ActivePlumbing PermitAddition and RemodelAug 2025
View Details
2025-012355 PP
๐Ÿ”งCommunity Plumbing
804 SHELBY LN
27.27 mi away

Insulation and Drywall

FinalMechanical PermitRemodelNov 2025
View Details
2025-143824 MP
๐Ÿ”งEnhanced Air Solutions
804 THERESA AVE
29.20 mi away

Interior Remodel One window will be replaced in the bathroom. The other existing windows are to remain. Project scope includes a bath and kitchen remodel. Ventilation/exhaust will be added to both bath and kitchen. The existing tub will be replaced with a shower.

FinalMechanical PermitAddition and RemodelSep 2025
View Details
2025-118350 MP
๐Ÿ”งRayz A/C & Heating LLC
804 THERESA AVE
29.20 mi away

Interior Remodel One window will be replaced in the bathroom. The other existing windows are to remain. Project scope includes a bath and kitchen remodel. Ventilation/exhaust will be added to both bath and kitchen. The existing tub will be replaced with a shower.

FinalElectrical PermitAddition and RemodelAug 2025
View Details
2025-104127 EP
๐Ÿ”งDRH ELECTRICAL & HOME SERVICES LLC
804 CALICO DR
29.42 mi away

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutDec 2025
View Details
2025-154840 MP
๐Ÿ”งIntelligent Air Services

Get alerts for Bastrop

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists